Posts Tagged ‘grinding

03
Sep
10

Highest DTS Installation Completed in Chile

LIOS Technology has completed a power cable monitoring project at a South American mining facility of Codelco in Chile. The Korean made 220 kV, 630 mm 2 XLPE high voltage cable system includes  fibre optics in metal tube (FIMT) and supplies pumps, SAG mills (Semi-Autogenous Grinding) and other grinding equipment.

The Distributed Temperature Sensing (DTS) condition monitoring system is installed at the control room at 3500 m above sea level providing continuous thermal assessment of the highly loaded power circuit. Among LIOS Technology’s more than 2000 permanent DTS installations this is certainly the one at highest altitude.

Read more:

Link Impressive track record of more than 2000 installations in permanent operation
Link Smart Grid: Real time ampacity predictions of power cable and aerial line installations
Link Distributed temperature monitoring of power cables



+Share

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 605 other subscribers

RSS +LIOS news

  • An error has occurred; the feed is probably down. Try again later.

+Contact us

Corporate head office:

LIOS Technology GmbH - Linear Optical Sensors
Schanzenstrasse 39
Building D9-D13
51063 Cologne (Köln)
Federal Republic of Germany

Tel: +49 221 99887-0
Fax: +49 221 99887-150

emailinfo@lios-tech.com

Follow LIOS on twitterFollow LIOS on twitter



Sales and technical support for North American market:

LIOS Technology Inc.
1400 Campus Drive West,
Morganville, New Jersey 07751
United States of America

Tel: +1 (732) 970 8062
Fax: +1 (732) 972 4410

emailinfo@lios-tech.com

Follow LIOS on twitterFollow LIOS on twitter




free counters